The cabinets come out of the kitchen...
...and the walls come down in the bathroom.
The bricks of the bathroom and kitchen are cleaned and bathroom floor is tiled (not shown).
We also find a thatching tool still hanging in the loft space.
Kitchen ceiling is covered and timbers cleaned in kitchen and bathroom.
Water heater is lifted onto new platform in loft and new mortar on bathroom walls.
Plastering is added between timbers in bathroom ceiling.
Kitchen floor is covered with bricklike tiles.
Bathroom wall covered with hexagonal tiles and lights installed in ceiling.
The kitchen window is removed to make way for a replica.
Hexagonal bricks in kitchen mortared and woodwork added; electrics and sink installed in kitchen, and cabinets in progress.
Toilet installed and working.
Kitchen cabinet doors and bathroom windows installed.
Bathtub installed.
Kitchen shelf and (folding!) table go in. Bathroom cabinet and shelf installed.